Project Phases : Phase 2B

Posted in PROJECT PHASES

PHASE 2B

Regional Hub for Crude Oil

Storage Capacities

Commodity Function tank size (m3) # of tanks capacity (m3) Throughput
ton/year
Crude Oil Main tanks 50,000 10 500,000 5 m
Total Crude Oil       500,000 5 m


Required Jetty Capacities:

  • One berth for large seagoing tankers up to100-120,000 DWT.
  • One berth for VLCC’s

Project Phases : Phase 2A

Posted in PROJECT PHASES

PHASE 2A

Regional Hub for petroleum products and bunkering services

Commodity Function tank size (m3) # of tanks capacity (m3) Throughput
ton/year
Fuel Oil Main tanks 20,000 4 80,000 1.5 m
  blending & delivery 10,000 4 40,000 0.8 m
      Total Fuel Oil 120,000 2.3 m
           
Gasoline Main tanks 25,000 2 50,000 1.0 m
  Main tanks 12,500 4 50,000 1.0 m
  Certification & truck delivery 5,000 2 10,000 0.2 m
      Total  Gasoline 110,000 2.2 m
Total throughput across the jetty         4.5 m

 

Additional oil products:

  • Expected additional Throughput: 2,4 million tones/year
  • Additional storage capacity: 2 x 40.000 m3 for fuel oil/gasoil

Bitumen:

  • Expected throughput: 200.000 tones/year
  • Inland distribution by means of trucks
  • Storage capacity: 4 x 5.000 m3


Required Jetty Capacities:

  • One smaller berth for bitumen and Marpol ships up to 20,000 DWT,  also providing additional capacity for bunker barges
  • One berth for additional oil product volume for ships up to50.000 DWT.

Project Phases : Phase 1B

Posted in PROJECT PHASES

PHASE 1B

Supplementary Storage Capacity/Regional Hub

 Storage Capacities

Commodity Function tank size (m3) # of tanks capacity (m3) Throughput
ton/year
Gasoil Hub/Domestic 40,000 1 40,000 0.8 m
  Hub/Domestic 20,000 1 20,000 0.4 m
  Hub/Domestic 5,000 2 10,000 0.2 m
Total Gasoil       70,000 1.4 m
           
LPG Hub/Domestic 50,000 1 50,000 1 m
Total LPG       50,000 1 m
Total throughput across the jetty       50,000 1 m

Required Jetty Capacities:

One main berth for large sea going tankers up to100-120,000 DWT

Project Phases : Phase 1A

Posted in PROJECT PHASES

PHASE 1A

PHASE 1A: Configuration

A 25 year SPA signed between Sonker and EGPC to handle 75% of Gasoil and 80% of LPG of Egypt’s imports via Red Sea

Storage capacities

Commodity Function tank size (m3) # of tanks capacity (m3) Throughput
ton/year
Gasoil Domestic supply 40,000 2 80,000 4m
  Domestic supply 20,000 1 20,000 1m
Total Gasoil       100,000 5m
           
LPG Domestic supply 50,000 3 150,000 3m
Total LPG       150,000 3m
Total throughput across the jetty         8m

Required Jetty Capacities:

One main berth for large sea going tankers up to 100-120,000 DWT